Remodeling and upgrade of 35 kV cubicals, testing and commissioning, S/S 35/10 kV in Bogdanci, Macedonia

Detailed design
Construction
Commissioning

Electric Power Company of Macedonia

2005

Installation of 150 energy meters at substations in Macedonia

Preliminary study
Detailed design
Installation

Electric Power Company of Macedonia

2005

Power supply of the Shopping Center
Ramstore – Skopje
10 kV cable connection with S/S 110/35/10kV “
Jug – Nova”(1,5km)
Substation 10/04kV; 4x1000kVA
(electrical and civil part)

Detailed design

NET Engineerig – Turkey

2005

Reconstruction and modification of Y/D switch at 110 kV transformer unit at Feni Industries

Detailed design
Installation

FENI Industries, Kavadarci

2005

Remodeling of protection and control equipment at SS Debar 1; 35/10 kV in Debar

Detailed design

Electric Power Company of Macedonia

2005

Analysis for connecting Combined Heat and Power Plant “Istok” to Electric Power System of Macedonia

Analysis

Toplifikacija – District Heating Company of Skopje

2005

110 kV transmission line bay

Detailed design
Construction

TITAN – Cement Company, Skopje

2005

SS Kocani; 35/10 kV; 2x8 MVA

Detailed design

Electric Power Company of Macedonia

2005

Reconstruction and modification of Y/D switch at 110 kV transformer unit at Feni Industries

Detailed design
Installation

FENI Industries, Kavadarci

2005

 
     
 