Project

Scope of Work

Client

Year of Completion

RIMSYS - River monitoring System Project in Macedonia (Prime Consultant ITECO Engineering Ltd, Switzerland)

Consultancy

Government of Macedonia, Ministry of Environment and Physical Planning

2004

Rehabilitation of lighting system on Ohrid Airport (Substation 10/0,4kV, 160kVA and diesel generator 150kVA)
(Prime contractor : Siemens – Germany)

Detailed design
Delivery of equipment, installation and construction

Civil Aviation Administration
of Macedonia

2004

Rehabilitation of Control and Protection System at HPP Vrutok  - Macedonia
(Prime Contractor: Emerson Process Management Power and Water Solutions, Pittsburg, USA)

Detailed design
Delivery, instalation and connection of control cables for Unit 3 and Unit 4

Electric Power Company
of Macedonia

2004

Rehabilitation of Control and Protection System at HPP Raven  - Macedonia
(Prime Contractor: Emerson Process Management Power and Water Solutions, Pittsburg, USA)

Detailed Design
Delivery of
equipment
Installation and
construction
Commissioning

Electric Power Company
of Macedonia

2004

110/35/10kV Substation “Stip 2”, completion improvement of existing protection system

Detailed design

Power Distribution Utility
of Stip City, Macedonia

2004

35/10kV Substation “Balvan”, installation of new numerical protection system

Detailed design

Power Distribution Utility
of Stip City, Macedonia

2004

35 kV overhead line between substations "Berovo" and "Pehcevo"

Detailed Design

Power Distribution Utility
of Berovo City, Macedonia

2004

New 35kV Switchgear in HPP
Raven – Macedonia
(Prime contractor : Siemens – Greece)

Detailed design
Installation and construction

Electric Power Company
of Macedonia
Mavrovski HPP’s - Gostivar

2004

Rehabilitation of Control and Protection System at HPP Vrben  - Macedonia
(Prime Contractor: Emerson Process Management Power and Water Solutions, Pittsburg, USA)

Detailed Design
Delivery of
equipment
Installation and
construction
Commissioning

Electric Power ompany
of Macedonia
Mavrovski HPP’s - Gostivar

2004

Rehabilitation of the existing substation 35/10kV “Pehcevo”

Detailed design

Power Distribution Utility
of Berovo City, Macedonia

2004

A new star-delta for power control of the 20MVA furnace transformer at FENI Industries

Detailed design
Construction
Commissioning

FENI Industries,
Kavadarci, Macedonia

2004

LV power supply of the hidrological monitoring stations: St. Bogorodica – river Treska Vliv Lepenec – river Lepenec Katlanovska Banja – river Pcinja Gevgelija – river Vardar
As a part of RIMSYS – River monitoring system in Macedonia, Ministry of Environment and Physical Planning

Detailed design
Construction

Government of
Switzerland

2004

 
     
 