Home About Us Services Projects Clients Quality Safety Contact Makedonski
 
     
   
     
 

Project

Scope of Work

Client

Year of Completion

Lightning protection and earthing system for the Brewhouse - Brewery Skopje

Detailed Design
Construction

Brewery Skopje AD
Skopje

2002

New 110 kV transformer bay and adaptation of the existing 10 kV switchgear at grid station
110/10 kV "Strumica 2"

Detailed Design
Construction
Commissioning

Power Distribution Utility of Strumica City, Macedonia

2002

Control system for monitoring, commanding and visualization of the technologic process in the plant of fine grinding of FENI Industries

Detailed Design
Construction
Commissioning

FENI Industries AD,
Kavadarci, Macedonia

2002

Reconstruction of the existing and construc-tion of a new 10 kV and 0,4 kV overhead lines, cable distribution network and substa-tions 10/0,4 kV in the villages of Otlja, Nikustak and Novo Selo at Kumanovo crisis region of Macedonia (financed by European Agency for Reconstruction, Skopje, Macedonia)

Construction
Commissioning

Electric Power Company
of Macedonia

2002

Supervision of electric works on reconstruction of the power distribution systems in the crisis regions of Kumanovo, Tetovo and Aracinovo – Macedonia (Prime Consultant ENEL Produzione SpA, Italy)

Supervision

European Agency for Reconstruction,
Skopje, Macedonia

2002

Substation 10/0,4 kV; 2x1600 kVA (electrical and civil part) with 10 kV cable connection for Energy House at Brewery Skopje

Detailed Design

Brewery Skopje AD,
Macedonia

2002

Reconstruction of power supply installation and construction of a new control system for Steam Boilers 1 and 2 at "Stara Kotlara" Brewery Skopje

Detailed Design
Construction
Commissioning

Brewery Skopje AD,
Macedonia

2002

 
     
 
ISO 9001:2008
 

Copyright © 1998-2011 TimelProject, d.o.o. All rights reserved.
Protected by the copyright laws of Macedonia.