Home About Us Services Projects Clients Quality Safety Contact Makedonski
 
     
   
     
 

Project

Scope of Work

Client

Year of Completion

Trans-Balkan Power Line Project Study - 400 kV interconnection Bulgaria - Macedonia – Albania
(Prime Consultant HARZA Engineering Company, Chicago, USA)

Study

Electric Power Company
of Macedonia

2001

Energy Sector Technical assistance Project in Kosovo, data collection

Analysis

HARZA Engineering Company, Chicago, USA

2001

Doshnica Project Feasibility Study (water supply of Negotino City) PHARE project,
Prime Consultant MWH-Montgomery Watson Harza, Brussels, Belgium

Study

Government of Macedonia,
Ministry of Finance

2001

Substation 10/0,4 kV, 2x630 kVA for power supply of Control Centre at Airport Petrovec, Skopje

Construction
Commissioning

Civil Aviation Administration
of Macedonia

2001

Earthing of 10 kV neutral point of the distri-bution systems connected to the grid stations: 110/35/10 kV "Ohrid 1", 110/10 kV "Ohrid 2" and 35/10 kV "Leskajca" at Ohrid City

Detailed Design
Measurements

Power Distribution Utility
of Ohrid City, Macedonia

2001

Substation 10/0,4 kV, 630 kVA for textile factory "Orka" – Skopje

Construction
Commissioning

ORKA Holding AD
Skopje

2001

Compensation of capacitive current at 6 kV cable distribution network in the coal mine of Suvodol, supplied from S/S 110/6 kV Suvodol

Analysis
Measurements
Detailed Design

TPP "Bitola"
Bitola, Macedonia

2001

Lighting and fire protection system at Coca Cola warehouse - Brewery Skopje

Detailed Design
Installation

Brewery Skopje AD
Macedonia

2001

Motor drive power distribution system for Energy House at Brewery Skopje

Detailed Design

Brewery Skopje, AD
Macedonia

2001

110 kV transmission Line between grid stations "Kicevo" and "Sopotnica"

Detailed Design

Electric Power Company
of Macedonia, Transmission Department Elektroprenos

2001

 
     
 
ISO 9001:2008
 

Copyright © 1998-2011 TimelProject, d.o.o. All rights reserved.
Protected by the copyright laws of Macedonia.