Home About Us Services Projects Clients Quality Safety Contact Makedonski
 
     
   
     
 

Project

Scope of Work

Client

Year of Completion

Engineering Analysis of the U.S. Army Camp Able Sentry Electrical Distribution System,
Airport Petrovec, Macedonia
(Prime Consultant STV Incorporated, Baltimore, USA)

Analysis

US Army Corps of Engineers, Europe District,
Heidelberg - Germany

2000

Least Cost Expansion Planning Study for Electric Power System of Macedonia up to 2020 year
(Prime Consultant HARZA
Engineering Company, Chicago, USA)

Study

Electric Power Company
of Macedonia

2000

Buk Bijela Hydroelectric Project in the
Republic of Srpska
(Prime Consultant HARZA Engineering Company, Chicago, USA)

Analysis

Electric Power Company
of Republic of Srpska

2000

Power supply on 110 kV, 35 kV and 10 kV level of US Army Camp Bond Steel at Kosovo

Analysis
Conceptual Design

US Army Corps of Engineers, Europe District Heidelberg-Germany

2000

Remodeling and extension of the existing LV switchboard in substation 10/0,4 kV, 2x1600 kVA for connection of two diesel generators by 1000 kVA at US Army Camp Able Sentry, Airport Petrovec, Skopje

Detailed Design
Construction
Commissioning

Brown & Root Services
Corporation, USA

2000

Substation 10/0,4 kV; 1000 kVA, LV distribution system, site and fence lighting at Canadian Army Camp Maple Leaf, Skopje

Detailed Design,
Construction,
Commissioning

National Defense
of Canada

2000

Build in of a new power transformer with capacity of 20 MVA and adaptation of the switchgears at grid station 110/35/10 kV "Struga"

Detailed Design

Power Distribution Utility
of Struga City, Macedonia

2000

Reconstruction of the grid station 110/35/10 kV
"Gazi Baba"

Detailed Design

Power Distribution Utility
of Skopje City, Macedonia

2000

Build in of a new power transformer with capacity of 10 MVA and adaptation of the switchgears at grid station 110/10 kV "Bitola4"

Detailed Design

Power Distribution Utility
of Bitola City, Macedonia

2000

Build in of a new power transformer with capacity of 20 MVA at grid station 110/10 kV "Strumica 1"

Detailed Design

Power Distribution Utility of Strumica City, Macedonia

2000

Installation of a capacitors bank  0,4 kV with control system at Printing house "Evropa 92" – Kocani

Detailed Design
Installation

Printing house "Evropa 92"
Kocani City, Macedonia

2000

Earthing of 20 kV neutral point of the distribution system conneted to the grid station 110/20/10 kV "Kumanovo 2"

Detailed Design
Measurements

Power Distribution Utility of Kumanovo City, Macedonia

2000

Existing situation investigation and options for reconstruction of the 35 kV overhead line HPP Spilje - s/s 35/10kV "Debar 1"

Analysis
Measurements

Electric Power Company
of Macedonia
Transmission and Distribution Department

2000

HV and LV distribution lines, 10/0,4 kV substations in Skopje (according annual agreement)

Construction

Power Distribution Utility
of Skopje City, Macedonia

2000

10 kV overhead line for power supply of watchtower "Kodra Fura" - Kosovo border

Construction

Ministry od Defense
of R.Macedonia

2000

Reconstruction of 110 kV transmission line between grid stations "Sopotnica" and "Bitola1"

Detailed Design

Electric Power Company
of Macedonia

2000

 
     
 
ISO 9001:2008
 

Copyright © 1998-2011 TimelProject, d.o.o. All rights reserved.
Protected by the copyright laws of Macedonia.